Page 400 - GM's Annual Inspection Booklet DEC- 2022
P. 400

PLAN HEAD - 4200 ( WORKSHOPS )
         SN PH PROJECT  PH Y-o-S PB   Short Name of Work          Alloc.  Last Sanc  Exp.   Exp.   Exp.   Anti.   Est.   %age REMARKS            Status
            SN ID            Item                                      Cost   upto   during   upto   TDC of  Status  Phy.
                             (PB,L                                            March  2022-  date  Rly    prog
                             B,DR                                             '22  2023       portion    of
                             M)
         17  1 11.03.42. 42 2019-LB-  Integrated Bogie Assembly and Dis-assembly   Cap.  153984 0  0  0  31/03/ Det.   Rly  As advised by COFMOW, revised specification, flow   WIP
                                                                                                          0
              19.1.52.0  2020 710 for LGD shops                                               2023  Est.    charts and essentiality submitted to COFMOW for
              01                                                                                   Sanc.    further process.
                                                                                                            - Draft specifications received from COFMOW has
                                                                                                            resubmitted duly incorporating required corrections.
                                                                                                            Tender floated on 04.05.2022. At present, Tender is
                                                                                                            under technical evaluation.
   395   396   397   398   399   400   401