Energy Conservation Measures implemented:

              60.39 kWp Solar Power Plant at TA Camp/MLY
                60.39 kWp solar power plant which makes 1105 RE Regiment (TA Camp) Energy Neutral
                was inaugurated by our beloved General Manager, Shri Gajanan Mallya, in the presence
                of  beloved  PCEE/SC  Shri  Somesh  Kumar  on  20th  December,  2021.  GM/SCR  has
                appreciated the efforts put by Electrical General Services towards making the buildings
                energy neutral.





















                                 Fig: 60.39 KWP solar power plant at TA Camp, MLY

              10kWp Solar Power Plant at HU/NZB

                10kWp  solar  power  plant  which  made  Health
                Unit  Energy  Neutral  was  inaugurated  by  our
                beloved  General  Manager  Shri.  Gajanan
                Mallya,  in  the  presence  of  beloved  PCEE/SC
                Shri.  Somesh  Kumar  on  02-11-21  during  the
                Annual Inspection of Ex.MUE-SC section.


              Inauguration of 10kWp Solar Power Plant at BSX

                10kWp  solar  power  plant  at  BSX  Railway  Station  was  inaugurated  by  our  beloved
                General  Manager  Shri.  Gajanan  Mallya,  in  the  presence  of  beloved  PCEE/SC        Shri.
                Somesh Kumar on 02-11-21 during the Annual Inspection of Ex.MUE-SC section. GM/SC
                has appreciated the efforts put by Electrical General Services.