  Solar Water Heaters at RPFTC/MLY:

                2  Nos.  of  500  LPD  capacity  solar  water  heaters  were  provided  on  Inspector
                Accommodation Building at RPFTC/MLY.




















              Automation of Pit lights at KCG:

                 Kacheguda Yard is having three pit lines and 4 catwalks. Arial lighting is provided on all pit
                   lines area with 6 Nos. of gantry consisting of total 60 Nos. of 200 W LED flood lights. Pit line
                   No. 3 and catwalks 3&4 together having 360 Nos. of 21 W, 24V DC Lights resulting into 7.5
                   kW. After considering distribution and AC/DC conversion net load coming around 9.5 KW.
                 These pit lights are switched ON from dusk to dawn irrespective of rake occupation in pit line.
                   Observing present practice of rake occupation, the pit line is not occupied with any train for the
                   total  duration  of  04  hours  per  day.  This  04  hours’  power  consumption  can  be  saved  with
                   adopting zero human intervention scheme for light switching ON/OFF as per rake placing and
                   pulling off from pit line.
                 Kacheguda power maintenance depot has made pit line 3 and catwalk 3&4 lights automation
                   with the help of diffuse-mode-sensor ML 100-8-1000-RT/103/115 (PEPPERL+FUCHS MAKE)
                   and associated gadgets. The block diagram of complete scheme is appended below.