  All the power control cables of LED Lights are made available at one source and are controlled
                   with this contactor. Override switch also provided for switching on all lights manually in case of
                   any snag in sensor.
















                 Cost of the project: Rs. 50,000/- per each pit line
                 Approx. Savings in units – 13,870 per annum
                 Approx. Savings in Rs. 1.38 Lakhs per annum
                 Payback period: 5 months

              GSM based SMART pumps at KCG

                   As  an  energy  and  water  conservation  measure,  14  Pumps  which  are  feeding  water  for
                    Station, Service buildings and Colony at Kacheguda were made smart pumps by GSM based
                    operation.
                   This automation resulted in saving of 3 staffs which are being used for operation of pumps
                    round the clock. Now these staffs are utilized in maintenance activity.



















              Automation of Pump at JCL

                5HP pump at LC 49 was feeding water to JCL Railway Station. LC 49 became RUB and there
                was  no  staff  available  to  operate the  Pump. To  resolve  this  issue  Pump  automation  has  been
                done. Pump can be operated through mobile app/web portal.