Page 66 - CRS Booklet DEC-2022
P. 66

  Cleaning  of  Power  Panels,  Control  Panels,  Inverter  Emergency  Changeover  panels  and  AC
                 Control Panels is done and also ensured for their connection‟s tightness.


















               Training conducted on maintenance and troubleshooting of LHB coaches and sensitized the staff
                 on fire prevention and safety aspects as part of fire prevention drive.

















































                                                           64
   61   62   63   64   65   66   67   68   69   70   71