Page 73 - CRS Booklet DEC-2022
P. 73

i.   Energization of newly Erected OHE between MBNR  – GED:

          single BG line OHE between section MBNR and GWD (RKM – 72.70,
          TKM  –  82.53)  energized  and  authorization  given  by  PCEE  for  running  electric
          traction locomotive after inspection on 27.11.2022.

























          C .Energization of Manoharabad (MOB/TSS) with incoming supply on 28.10.2022

          Manoharabad MOB/TSS of 132/25KV charged successfully on 28.10.2022 by extending 132KV  supply
          From  Narsapur  TSTRANSCO  sub-station (GSS).

          D .Panduranga swamy Road (PASR/TSS): Charged on 29.10.2022

          Divitipalli TSS of 132/25 KV charged successfully on 29.11.2022 by extending 132KV supply From
          Ankannapally TSTRANSCO sub-station(GSS).

          V. Reliability  improvement  works:

          i.  Provision of Disconnector assembly on top side of the Lightning Arrester (LA):

          As  per  revised  SMI  no.  TI/SMI/0048  (Rev.  1)  dated:  23.07.2021,  the  Disconnector
          assembly  of  LA  should  be  repositionedat  the  Top  of  the  LA.  The  Division  has
          taken-up the work and replaced 16no LAs modifications.
          ii. Checking of OHE with 2032mm Pantograph:

          As  per  the  instructions  from  the  Headquarters,  the Checking of OHE with
          2032 pantograph completed  in  KCG - MOB , KCG - UR section in HYB Division.