VII Other  Safety  Improvement  Works  in  train  operations:

          1.   Provision of Sigma Boards ahead of STOP Signals:To
          assist Loco pilots  for  easily  identifying  the STOP signals
          during foggy weather conditions, Division has taken up the work
          of provision of Retro reflective
          SIGMA boards, ahead of the STOP signals.  120 no‟s
          sigma boards were provided.


          2.   Provision of new  earth pits:
          Total 15 no.s of new earth pits are provided in SC - FMsection for improving the
          earthing network in safety point of view.

          3.      Provision  of  Thimbles:

          To avert the catenary strands cut inside the catenary suspension clamp at the
          time of tripping with high fault currents particularly in monkey menace areas,
          RDSO issued the provision thimblesin each location. Total in 418 locations
          thimblesare being provided.














             4. Provision of Nylon net on portals:

           As  per  TI/MI/0050 issued  by RDSO  to  prevent from Bird menace  on Traction Installations by
           provision of Nylon net inside the existing fabricated structures. 40 No. Portals/TTCs of nylon
           mesh provided.
















            5. Total 652 No’s Tree branches trimmed due to less clearance from Live OHE.