 680 M MULTI-PURPOSE TERMINAL AT DAMIETTA SEAPORT







 PROJECT DETAILS  PROJECT OVERVIEW:
 Location: Damietta, Egypt  EDECS undertakes the construction of a versatile terminal at Damietta Seaport, Egypt, where a comprehensive array

 Name of Client: Damietta Port Authority (DPA)  of tasks is set to redefine maritime infrastructure. Central to the project is erecting a 1,100-meter environmental
 Role in Contract: Main Contractor  barrier to safeguard the navigation channel during sand reclamation, alongside a substantial expansion of the
            quay wall and stacking area by over 55,000 square meters. Advanced soil improvement techniques, including
 SCOPE OF WORK  Prefabricated Vertical Drains (PVD), Vibro-compaction (VC), and Rapid Impact Compaction (RIC), are deployed to
            enhance ground stability.
 Consultant Name: Maritime Research & Consultation Center (MRCC)
 INFRASTRUCTURE  Contract Duration: 17 Months  At the same time, deep foundation works encompassing diaphragm walls and barrettes ensure the structural integrity
 Project Type: Infrastructure Works
            of the  terminal.  The construction also entails assembling the superstructure,  installing  essential berth furniture,
 Consultant Name: Maritime Research & Consultation Center (MRCC)  implementing Mechanical, Electrical, and Plumbing (MEP) systems, and comprehensive infrastructure development,
 BUILDINGS  Contract Duration: 9 Months  all geared towards optimizing operational efficiency and bolstering capacity. Key performance indicators include the
 Project Type: Port Buildings
            construction of 1,250 meters of quay wall, reclamation of 1,000,000 cubic meters of land using on-shore equipment,
 Consultant Name: Maritime Research & Consultation Center (MRCC)
 MARINE  Contract Duration: 17 Months  and utilizing 680 diaphragm wall panels and 500 barrettes.
 Project Type: Diaphragm Wall Quay Wall  Additionally, it involves installing advanced cargo handling equipment and storage facilities.