Page 7 - OSU BCM proposal 041621 spread format_Neat
P. 7

01
 PRIMARY CONTACT



            Nate Baker, AIA, NCARB
            Managing Principal
            Integrated Architecture
            O. 405.509.7556
            C. 405.657.9555
            nbaker@integratedarc.com



                                                                                                        02
 FIRM DESCRIPTION





                                                                                Staff:
                                                                                6 employees
 We believe ARCHITECTURE IS not a building...  Integrated Architecture (IA) was started in February of 2013 based simply      3 Architects
 but rather THE EXPERIENCE people have in the built environment.  on providing quality architectural leadership, design and service to clients.      2 Architectural Interns
            We believe architecture itself is a specialty service and we strive to provide      1 Administrative
            project leadership, innovative design, technical development, clear and concise
 There are two basic reasons any client would hire IA: Design and Technical knowledge. We invision a solution based on   documents, and coordination through construction for our client’s vision   Locations :
 the client’s needs, wants, budget and priorities. We then take that vision and plan the execution of the physical structure   Edmond Oklahoma
 that delivers the intended experience. For OSU BCM that experience should be a high quality, cost effective, energy   to become reality. We consider building the project team a critical starting
 efficient building that supports student ministries. The IA team can help the BCM at OSU deliver an environment where   point to a successful project. The core team often includes specialized design   One South Broadway, Suite 302
 staff and students can experience their full potential in christian ministry.  consultants and engineering consultants, but always includes the client and   Stillwater Oklahoma
            construction team. We help our clients build a team they can trust to bring   602 S. West Street, Suite B
            value to the project. In 2018 we expanded our office to a Stillwater location.
            Stillwater is not a second location as much as it is an expansion of our team to   Mailing Address
            a new location. We are one team working together out of two locations.  PO Box 7806
                                                                                Edmond OK 73083




            Team Philosophy:                   Building Type Experience:         Services:
            Each member of Integrated          Athletic                          Architectural Team Building
            Architecture’s team has been       Spiritual                         Documentation of Existing Structures
            uniquely gifted to provide a valuable   Education                    Feasibility Studies
            contribution to each project. Our   Health Care                      Facility Assessments
            contribution as individuals who    Libraries                         Site Selection Analysis
            represent a professional group should  Aquatic                       Zoning & Code Analysis
            be provided through:               Office / Commercial Development   Building Information Modeling (BIM)
                                               Laboratories                      Master Planning
            •   Striving for Simplicity        Greenhouses                       Programming
            •   Exercising Honesty                                               Design
            •   Showing Respect                                                  Sustainable Design
            •   Being Authentic                                                  Interior Design
            •   Dedicated Work Ethic                                             Graphic Presentations
                                                                                 Project Management
                                                                                 Budget Evaluation & Cost Control
                                                                                 Construction Administration
 IA Stillwater Office

                                                                                                                   7
   2   3   4   5   6   7   8   9   10   11   12