Page 153 - GM booklet 2019 test
P. 153
TL & AC Performance:
Action Plan Target works of Divisions for the year 2019-20 for
AC & TL coaches (MAXIMUM LIMIT) (Upto November – 2019)
Target Target (Max
S. Action plan item (Max limit) for Actual 2018- limit) for Actual
No 19 (Upto Nov-19)
2018-19 2019-20
1 Punctuality loss cases on owner ship basis on TL&AC account.
a. AC Coaches 1 1 1 0
b. TL Coaches 1 0 1 0
2 CNAC 0 0 0 0
3 Ineffective percentage
a. AC Coaches 0.02 0.13 0.12 0.06
b. TL Coaches 0.001 0.000 0.000 0
4 Sick Marking incidences
a. AC Coaches 6 4 4 0
b. TL Coaches 32 38 34 20
5 V-Belts failures - no. of incidences
a. AC Coaches 24 34 30 28
b. TL Coaches 21 45 40 35
6 Battery failures leading to cells replacement - No. of incidences
a. AC Coaches 21 16 14 21
b. TL Coaches 69 80 72 51
Replacement of FTL/CFL/IC fittings with LED light in AC coaches
7
AC Coaches 57 0 86 85
Replacement of FTL/CFL/IC fittings with LED light in Non-AC coaches
8
TL Coaches 333 0 365 280
Innovations/ System
9 2 0 2 1
improvement
Training of staff-
10 6 16 9 10
Supervisors
Training of staff-
11 30 87 45 31
Technicians
No. of
12 Seminars/workshops/ to be 7 34 10 20
conducted
133