The following activities have been carried out over the division.

                  Removal of redundant overhead lines:

                      Redundant overhead lines have been removed duly laying UG cables at North
                    Lallaguda and Medchal Sections.










                                                     Before removal of OH lines


 Fig. Before                                               Fig: After










                                                         After removing OH lines




                     Checking and ensuring firmness of electrical joints.
                    A drive has been conducted to check all the joints and terminations in MDBs, and
                    other sub distribution boards for any loose joints and ensured the firmness.















                                                Checking of joints and terminations