12 spans of OH line removed at TA Camp (09 Spans) and ZRTI (03 Spans). Power
supply extended to TA Camp through UG cable by providing junction boxes at
individual load points.
TA Camp OH line removed & provided Provided cable termination box
LTUG Cable for TA Camp
Renovation of Auditorium at Rail Nilayam:
The following Electrical installations are additionally provided in Renovated Rail Nilayam
Auditorium along with existing one:
S.No Description Capacity Quantity
1. LED Down Light 15W 14
2 Inverter type Packaged AC unit 8 TR 4
3. LED Warm White Flood light 120W 4
4. LED (for Lighting to Chairs) 3W 50
5. LED Down Light 2W 30
6. RGB Lights 3W 13
7. LED Warm White 3W 11
8. RGB Lights (for stage) 10W 13
Connected load details of Renovated Auditorium
Before renovation = 94.25 kW
After Renovation = 87.36 kW
Decrease in connected load = 6.89 kW.
Lighting at Renovated Auditorium: