  12 spans of OH line removed at TA Camp (09 Spans) and ZRTI (03 Spans). Power

                    supply  extended  to  TA  Camp  through  UG  cable  by  providing  junction  boxes  at
                    individual load points.













                                  TA Camp OH line removed & provided   Provided cable termination box
                                             LTUG Cable                     for TA Camp

                      Renovation of Auditorium at Rail Nilayam:

               The following Electrical installations are additionally provided in Renovated Rail Nilayam
               Auditorium along with existing one:

                           S.No               Description                Capacity       Quantity

                             1.    LED Down Light                           15W             14
                              2    Inverter type Packaged AC unit           8 TR            4

                             3.    LED Warm White Flood light              120W             4

                             4.    LED (for Lighting to Chairs)             3W              50
                             5.    LED Down Light                           2W              30

                             6.    RGB Lights                               3W              13

                             7.    LED Warm White                           3W              11

                             8.    RGB Lights (for stage)                   10W             13


                 Connected load details of Renovated Auditorium

                   Before renovation = 94.25 kW
                   After Renovation = 87.36 kW
                   Decrease in connected load = 6.89 kW.

               Lighting at Renovated Auditorium: