Renovation of PCME office at Rail Nilayam:
The following Electrical installations are provided for Renovation of PCME office.
SI. Description Wattage Qty Total Load in Remarks
No Watts
50W 22 1100
1 Fans
55W 5 275
15W 4 60 Net increased load is
2 Lighting
36W 48 1,728 4618W to the previous
3 Computer 250W 40 10,000 connected load is
4 AC 2250W 3 6,750 16345W
5 S&T 350W 3 1050
Total load 20,963
PCME office at Rail Nilayam
Renovation of DMRC Office at Rail Nilayam - Electrical Arrangements
The following Electrical installations are provided for DMRC office
SI. Description Wattage Qty Total Load Remarks
No in Watts
1 Fans 50W 22 1100
Wall Mounting fans 55W 05 275 Net increased
2
Lighting LED down light 15W 04 60 load of
3 LED 2x2 ft 36W 48 1728 24,669W with
4 UPS 5KVA 7500W 01 7500 comparison to
5 3 Tr Cassette type AC 2200W 08 17600 the previous
load 4,644W
6 S&T net rack box 350W 03 1050
Total load 29,313