  RPF/TC/MLY renovation work:

                  All  renovation  works  pertaining  to  electrical  are  carried
                  out with in-house resources with replacement of 15 Nos
                  of 20W LED lights, 8 Nos of LED Street lights and 18 Nos

                  of  BLDC  fans.  3  No’s  of  Geysers  provided  as  a  new
                  provision.

                                            st
                Newly  constructed  1   floor  of  Crew  rest  room  at  Gadwal  –  Electrical
                  Arrangements














                                                             st
                                     Newly Constructed 1  floor of crew rest room

                                                                                                    st
                       Following Electrical equipment has been provided in newly constructed 1  floor of
               Crew rest room at Gadwal.

                        Sl. No.             Description                 Capacity         Qty (No.s)
                           1       Inverter type split AC units           1.5 Tr             13
                           2       5 Star Geysers                         15 ltrs            07
                           3       Ceiling fans                           50 W               36
                                                                          22 W               23
                           4       LED indoor fittings
                                                                          15 W               20
                           5       Reading lamps                           5W                30

                   Net increase in connected load is 36kW.

               Rail Kalarang Optimization of AC plants:

                  AC Plant Rail Kalarang/CKL (relocation & renovation work) - Previously condenser
                    units are not able to condensate upto optimal conditions due to obstruction in airflow.
                    All condensers units are elevated to higher level for optimal condensations there by
                    better  cooling  temperatures.  Return  air  path  also  redesigned  for  better  air
                    conditioning efficiency. Dampers are provided with controls for stopping the air flow
                    in non-running AC unit.








                      AC Plants before shifting of outdoor            After shifting & modified Outdoor units duly
                                   units.                               fabricated with M.S Channel Structure.