Solar power plants commissioned over Hyderabad Division 2019-2020 :
Fig: ZRTI Admin Building
Fig: Krishna Hostel 60kWp Solar Plant at Godavari Hostel 30kWp Solar Plant on COP of PF
Fig: Junior College/LGD Building/MLY No. 2 at JCL Railway Station
Fig: Godavari Hostel
Energy Neutral SSE EM Offices: The concept of Energy Neutral Office is taken very
positively and implemented in the SSE/JEE in-charge offices over the Hyderabad
Division. All the fabrication and grouting of SPV panels are carried out within in house
sources. SPV panels available in the depots were utilized for the concept of energy
neutral office, a reality. All SSEs are encouraged to make their offices Energy Neutral
duly taking all lights / fans loads including office equipments and compound area
lighting.
No of Units
No of Offices made generated per annum Total No of Total revenue
Energy Neutral @ 4 units average units saved Saved (Rs.)
per day.
10 1440 14400 144000
SAFETY PRECAUTION MEASURES:
Observation of Electrical Safety Week over the division:
th
th
Electrical safety week has been observed from 6 to 13 May, 2019 in the
division. A safety drive has been conducted during the safety to ensure electrical safety
of all electrical installations.
134