Page 185 - GM booklet 2019 test
P. 185

1.1 Over view of coaching maintenance:

                            Maintenance Type             KCG      KRNT  MBNR          NZB  TOTAL

                                       Express             8         -         -        -         8
                      PRIMARY
                                       Passenger           2         -         -        -         2
                                       Express             5         2         -        1         8
                      TURN ROUND
                                       Passenger           4         3         2        8        17
                      PASS             Express            24        25         -       22
                      THROUGH          Passenger           4         7         -        9
                                       Express            415                                    415
                      Coach            Passenger          54                                     54
                      holding
                                       Total              469        -         -        -        469
                          Trains with OBHS                 3                   -        -         3
                        Bio Toilets /                    1712/                 -        -       1712/
                        Coaches                           450                                    450



               1.2  Other activities at KCG:

                        IOH Schedule – 27 coaches per month on average

                        Sick line repairs-One coach on average per day.

                        Line-calls- 03 calls per day on average.

                           Road Mobile ART

                       (Beat: a) Coaching depot and Yard at KCG.
                                    b) MMTS routes from SC (excluding) to FM.
                                    c) Local train routes from SC (excluding) to MED.
                                    d) Loco shed MLY.)

               1.3    Mechanized Laundry:

                             1 Ton mechanized Laundry is being maintained by KCG depot. Around
                               2800 bed roll sets are being washed daily in laundry.

                             Daily  Average  2800  bed  roll  sets  are  loaded  in  Kacheguda  Primary
                               Maintained trains.

                 1.4  “B” class ART /SPMRV at Nizamabad (Beat :NZB – PAU- 143 KMs and NZB
                      - SC160 KMs )

               1.5    Human  Resources  Development-              HYB  division  has  an  Area  Training
                      Centre(ATC)    based  at  KCG  taking  care  of  training  needs  of  the  artisans  of
                      HYB & NED divisions.


                                                            160
   180   181   182   183   184   185   186   187   188   189   190