Page 188 - GM booklet 2019 test
P. 188
EnHM
1. As per NGT norms, BSX station cleaning activity taken over by EnHM wing
from Commercial branch w.e.f. 01.12.2019.
2. As per NGT norms separate master dustbins of 2 nos. each at NZB and BSX
stations to be installed is under process.
3. The system developed for material recovery facility (MRF) for segregation of dry
waste viz., paper, plastic and other for further disposal. Pet bottles are
collected form station, rag picking and OEM fed into bottle crushing machine.
The crushed plastic sold to the agents in the presence of commercial inspector
and the amount is deposited at station booking counter.
4. At NZB and BSX stations 04 nos. of CC cameras are installed to monitor the
cleaning activities through CC cameras.
5. Rain harvesting pits, tree plantation, nursery have provided during the year
2019- 20 in KCG - MUE section
Afforestation
Target Actual
For the Month Cumulative For the Month Cumulative
Category
Route No. of Route No. of Route No. of Route No. of
Km Trees Km/Ha Trees Km Trees Km/Ha Trees
Boundary 18.055 60
Plantation Kms 21666 217 Kms 260000 Km 72000 137.5 km 165000
Block 6.666 80.0
Plantation Ha 6666 Ha 80000 18 Ha 18000 85.0 Ha 85000
Rain Water Harvesting (No. of Pits / Locations)
RWH Target Actual
200 Nos (16 stations) 200 Nos. (6 stations) 140 s. (10 stations)
1. Procurement of twin stainless steel dust bins for NZB station of 80 nos. is
under process.
2. Procurement of decomposting machines of 01 no. for NZB is under
process.
3. Roof top harvesting pits constructed – 34 Nos
4. One nursery being maintained at NZB.
Energy Conservation
Renewable Energy
Cumulative for the Year
For the Month of Oct 19
Item 2019-2020
Target Actual Target Actual
Renewable Energy
Commissioned 310kWp - 3700kWp 100 KWp
Energy Audits - 1 2 1
163