EnHM

                   1.  As  per  NGT  norms,  BSX  station  cleaning  activity  taken  over  by  EnHM  wing
                       from Commercial branch w.e.f. 01.12.2019.
                   2.  As per NGT norms separate master dustbins of 2 nos. each at NZB and BSX
                       stations to be installed is under process.
                   3.  The system developed for material recovery facility (MRF) for segregation of dry
                       waste    viz.,  paper,  plastic  and  other  for  further  disposal.    Pet  bottles  are
                       collected form station, rag picking and OEM fed into bottle crushing machine.
                       The crushed plastic sold to the agents in the presence of commercial inspector
                       and the amount is deposited at station booking counter.
                   4.  At NZB and BSX stations 04 nos. of CC cameras are installed to monitor the
                       cleaning activities through CC cameras.
                   5.  Rain  harvesting  pits,  tree  plantation,  nursery  have  provided  during  the  year
                       2019- 20 in  KCG -  MUE section



               Afforestation

                                                Target                                 Actual
                                   For the Month       Cumulative        For the Month        Cumulative
                      Category
                                  Route    No. of    Route     No. of   Route    No. of    Route      No. of
                                   Km      Trees    Km/Ha      Trees     Km      Trees    Km/Ha       Trees

                      Boundary    18.055                                  60
                     Plantation    Kms     21666   217 Kms    260000     Km      72000   137.5  km   165000
                       Block      6.666              80.0
                     Plantation    Ha       6666       Ha      80000    18 Ha    18000    85.0 Ha    85000

               Rain Water Harvesting (No. of Pits / Locations)
                              RWH                        Target                        Actual
                     200  Nos (16 stations)      200 Nos. (6 stations)            140 s. (10 stations)

                          1.  Procurement of twin stainless steel dust bins for NZB station of 80 nos. is
                              under process.
                          2.  Procurement  of  decomposting  machines  of  01  no.  for  NZB  is  under
                              process.
                          3.  Roof top  harvesting  pits constructed – 34 Nos
                          4.  One nursery being maintained at NZB.

               Energy Conservation


                    Renewable Energy
                                                                               Cumulative for the Year
                                                For the Month of Oct 19
                              Item                                                    2019-2020
                                                  Target         Actual         Target           Actual

                     Renewable Energy
                     Commissioned                 310kWp            -         3700kWp          100 KWp

                     Energy Audits                    -             1              2                1