Page 191 - GM booklet 2019 test
P. 191

MECHANICAL (POWER)

               Activities:


                   1.  Combined Crew Lobby

                       1.  KCG major Lobby with 347 Crew.
                       2.  NZB minor Lobby with 102 Crew.
                       3.  SS/GWD with 26 Crew

                   2.  Running Room & Rest Rooms:

                                         Running Room/               Bed            Peak hour Bed
                           Station
                                           Rest Room          Accommodation           occupation
                            NZB           Running Room                54                   54
                            KCG             Rest Room                 12                   10
                           MBNR             Rest Room                 07                   04
                            GWD             Rest Room                 26                   20

                            KRNT            Rest Room                 15                   14

                   3.  RCD at KCG: Oil Storage capacity 390 KL
                                                                                             Average
                                       No. of                                   Average
                        Name of       Storage      Capacity of       Total     issue per       No of
                          RCD                       each tank     Capacity                    Locos
                                       Tanks                                       day
                                                                                             per day
                                                    70 KL- 02
                          KCG            03                         390KL            73KL       32
                                                   250KL – 01

                   4.  System improvement

                    4.1 Fuel Conservation

                        By continuous monitoring of shutting down of rear locos of MUs while hauling
                        light/empty loads: A quantity of 20KL of HSD oil was saved by shutting down
                        104  rear  locos  during  last  8  months  of  2018-19  resulted  in  savings  of  Rs.
                        7,51,519/- to the Railways.
                        Shutting Down of Lie-over locos in Yard a quantity of 183 KL of HSD oil was
                        saved  by  shutting  down  2108  rear  locos  during  last  8  months  of  2018-19
                        resulted in savings of Rs. 68,64,215/- to the Railways.


                   5.  Performance statistics:

                    5.1 Diesel Loco Outage:
                                          Year                                    Average
                        2018-19                                                      18.8
                        2019-20 (Apr-Nov)                                            17.8

                                                            165
   186   187   188   189   190   191   192   193   194   195   196