Page 194 - GM booklet 2019 test
P. 194
Month Description of the Drive No. of Staff
Counseled
January -19 Coupling /uncoupling procedure of “H” type CBC 138
Prevention of Yard Derailments 87
Procedure of Diesel Light Engines. 210
February-19 Prevention of SPAD. 208
Winter Precautions and Rail /Weld failures. 186
Ensuring safety while executing 152
works adjacent to running lines
March - 19 Prevention SPAD cases 236
Prevention of LC gate “open” cases 138
April -19 Dead Loco Movements 200
Examination of fuel tank bolts and nuts, under frame and 185
under gear items of Diesel Locomotives.
May-19 Procedure & educating staff on E type H Type & Transition 231
screw coupling.
Prevention of SPAD 285
Fire Prevention 186
Prevention of LC gate open condition 145
Cab changing procedure in different locos 193
Shunting operations performed with Diesel Locomotive. 128
Shunters counseled in Yard layouts. 18
June- 19 Preventions to be taken while attaching WDM2/WDP4 Dead 152
Locomotives
Loco pilots and Assistant Loco Pilots looking back of Train. 213
Action plan to arrest improper CBC coupling cases on 153
coaching trains
July -19 Monsoon preparedness for Diesel Electric loco motives and 365
operation
July-19 Railway Board Safety drive to ensure safe train operations 137
Freight train examination. 197
Instructions to avoid SPAD cases. 264
August -19 Special drive for August to October 2019
September-19 Monitoring of Loco Pilots in return direction by nominated 2052
CLIs
November -19 Functioning of APU 104
Working of stations in unusual circumstance
1. Loco pilots/ Asst. Loco Pilots
2. Foot plates inspections 129
3. Crew lobby inspections 12
4. Running room/Rest room 04
04
168