Kacheguda  Station  Heritage  Building  /  Hyderabad  Division/SCR  bagged
            "CERTIFICATE OF MERIT" award at National Level Performance Awards for CPWD, PHED
            &  State  PWDs  Buildings  Sector  during  "Bureau  of  Energy  Efficiency  -  National  Energy
            Conservation Awards - 2019" organized by Ministry of Power, Govt. of India. It was received
            by  PCEE/SCR,  DRM/HYB,  SSE/HT  and  SSE/CKL  from  Shri  R.K.Singh,  Honourable
            MoS/Power on 14.12.2019.



















                  Commissioning of Solar On grid plants over Hyderabad Division:

                   Railways has taken Green initiative to provide the solar power plants on the roof top
               of  Railway  Stations,  sheds  and  other  service  buildings  through  Power  Purchase
               Agreement  (PPA)  @  Rs.4.99/-  per  unit  (kWh)  on  Design,  Build,  Finance,  Operate  and
               Transfer (DBFOT) basis with the objective of Generating and supplying Energy to Railway
               Installations. 1560 kWp Solar Plants have been commissioned over Hyderabad Division
               in 2018-19 by M/s. Renew Solar Power Systems and 100kWp by M/s. Azure Power in
               2019-20 as a part of the National solar mission of the Govt. of India.

               Solar Plants installed departmentally: 252.64 kWp
               Solar Plants installed through PPA mode: 1660 kWp

              Replacement/Repairs to defective Solar inverters:

               Rail House/SC:
                The  solar  inverter  at  Rail  House/SC  was  defective  and  same
                has been replaced with a new one against DS-8.
                Details of new Inverter:
                Make: Sun Energy System, Cap: 10KVA/120V.
                Generation is about 24-30 units / day.
                                                                                Solar inverter at Rail House/SC


              BSX and KMC Stations:
                The  solar  grid  tie  units  (inverter)  of  SGTU-105
                Model, 5 KW were repaired by replacing the control
                PCB  and  LCD  power  PCB  at  both  BSX  and  KMC
                stations  through  M/s.  Techno  Instruments  &
                Controls. On an average these plants are generating
                15 - 16 units/day and the information on generation
                is being uploaded every day in HQ‟s Google sheet.               Inverters at BSX station