  Poodoor Stations:
                3 kWp Solar Wind Hybrid Power plant at Poodoor was not charging the batteries at optimum
                level. Priority settings of charging circuit were re- programmed from grid to solar by OEM and
                plant is now working normal. On an average this plant is generating 12 - 13 units/day.







                                             Hybrid Plant at Poodoor

              Hybrid Plant at C-TARA:
                Defective  1.75kWp  hybrid  plant  was  revived  duly  making  repairs  to  damaged  wind
                turbines and also SPV panels at C-TARA. This plant is generating about 10-12 units per
                day.
















                                     (Before)                                                         (After)
                                          Defective wind turbines                                     Hybrid plant after repairs



              Renovated  Class  rooms  at  STTC:  Power  supply  arrangements  made  for  Renovated  Class
                rooms at STTC and provided 09 Nos. of Circadian lights of 35W. This has been inaugurated by
                Member/S&T on 24.11.19.







                                        Circadian lighting @ STTC/MLY

              ECS/MLY: 50No.s of 22W LED west level pit lights are provided in pit lines at ECS/MLY.







                                                LED 22W Pit light