Poodoor Stations:
3 kWp Solar Wind Hybrid Power plant at Poodoor was not charging the batteries at optimum
level. Priority settings of charging circuit were re- programmed from grid to solar by OEM and
plant is now working normal. On an average this plant is generating 12 - 13 units/day.
Hybrid Plant at Poodoor
Hybrid Plant at C-TARA:
Defective 1.75kWp hybrid plant was revived duly making repairs to damaged wind
turbines and also SPV panels at C-TARA. This plant is generating about 10-12 units per
day.
(Before) (After)
Defective wind turbines Hybrid plant after repairs
Renovated Class rooms at STTC: Power supply arrangements made for Renovated Class
rooms at STTC and provided 09 Nos. of Circadian lights of 35W. This has been inaugurated by
Member/S&T on 24.11.19.
Circadian lighting @ STTC/MLY
ECS/MLY: 50No.s of 22W LED west level pit lights are provided in pit lines at ECS/MLY.
LED 22W Pit light