Page 53 - GM booklet 2019 test
P. 53

  Total 107 Hotspots in 65 locations (out of 325 locations) were identified with abnormal
                      temperatures and taken suitable remedial action to mitigate hotspots during the
                      period June to Aug-2019.
                 PCEE/SCR has awarded group cash award in recognition of innovative work done  by
                     the supervisors and staff of Hyderabad Division.
                 HQ has issued a special drive for all other divisions of the zone based on the above
                      initiation by HYB Division.

             Quick  Watering  facilities  to  Platforms  of  Kacheguda  Railway  Station  –  Work  under
               progress:

            Quick  Watering  arrangements  to  Platforms  3  &  4  of  KCG  Station  are  under  progress.
            Provided  3  pumps  of  50HP  capacity  with  specification  2-Pole,  Rated  power  37  KW,
            frequency 50 Hz, Rated Voltage 415V, Rated current 60.5A, PF 0.91, Efficiency (FL) 93.7%,
            Insulation Type - F.















                          Quick Watering arrangements to Platforms 3 & 4 of KCG Station

            Optimization of Lightly loaded substations at NLGD and SLGD:

            In the process of optimization of the performance of the available transformers, the loads
            connected on the various transformers were studied and found some transformers are very
            lightly  loaded  and  some  transformers  are  not  loaded  upto  the  optimum  levels.  The
            transformer  gives  optimum  efficiency  when  Iron  losses  are  equal  to  Copper  losses.  Iron
            losses of the transformer are constant irrespective of the connected load and copper losses
            are directly proportional to the square of load current.

                   By shifting the loads of the lightly loaded transformers to the transformers where the
            loads were not upto the optimum levels, Division has eliminated the constant losses (5% of
            transformer capacity) of lightly loaded transformers.

                                           Alternate                                                 Anticipated
         Name     Transfor                  Source     Protection    Load in kVA    Anticipated         Annual
         of the    mer         Make        Substatio     MCCB                      Annual Energy       Savings
           SS     Capacity                                        Before  After   Savings in kWh
                                               n                                                         (Rs.)
                   2 x 250                SSE/NLGD
         LGDH                   ECE                      200A       140    190         35040            273312
                     kVA                   Office SS
          IRISE    2 x 250    Kirloskar    IRISET- 2     200A       190    230         35040            273312
            T        kVA
                   2 x 250                  Lekha
          LOFP                  HPE                      200A       190    240         35040            273312
                     kVA                    Bhavan
                   2 x 160                 ECS/MLY
          MLY                   ETE                      400A       110    140         22425            174920
                     kVA                      SS
          New
          GLR/     1 x 100                  Colony
                                           Ayyappa
          Colon      kVA          --      Feeder SS      100A       60      74         14016            109325
            y
                                                            46