HT Failure Data
Month 2018-19 2019-20 Remarks
April 2 4 Power failure trend
May 2 6 Year 2018-19
June 1 5
After noticing
July 5 8 the continuous Year 2019-20
Aug 3 2 increasing 8
failure trend 7
Sep 7 4 DEM was 5 5
Oct 3 2 introduced in 3 2 4 3 2 2
the month of
Nov 2 0 Aug-2019 for 1 0
HT
Dec 4 installations.
Jan 5 June July Aug Sep Oct Nov
Feb 1
Mar 0
The results of the Directed Electrical Maintenance are quite encouraging in case of
HT installation, hence adopted same philosophy on all LT installations i.e. MDBs, SDBs etc.
from 15/10/2019 throughout division.
Natural day light pipe system at control room of new sub-station/KCG
Provision of Nature day light system for 5 Nos at control room of new sub-station at
KCG.
5 Nos of Nature day light system at control room of new sub-station at KCG.
3 Way RMU Commissioned near Qtr No. 100 in SLGD
3 Way RMU commissioned near building no. 100 in SLGD. Alternate feeding from IRISET
feeder ROC to RMU near Temple & RMU near MFT colony of Hospital feeder.
3 Way RMU Commissioned near building no. 100 in SLGD