  Provided  1000 LPD Solar Water Heater at Crew rest room/GWD:
                Solar water heater of 1000LPD capacity is provided at Crew Rest Room, Gadwal.








                                                       Solar water heater of 1000LPD

              Directed Electrical Maintenance (DEM):

                DEM  is  a  new  initiative  from  the  transformation  cell  of  Hyderabad  Division;  DEM  is
                envisaged  and  implemented  initially  on  HT  installations  over  the  Hyderabad  Division.
                Directed  Maintenance  is  to  tackle  staff  shortage  and  expenditure  control  issue.  The
                strategical  point  is  effective  planning  of  transportation,  materials  (Spares/Tools  &
                ladders)  and  manpower so  that a  team  can  concentrate  on  one unit  at  a  time,  either
                Station and LC gate or colony in all aspects so that there won‟t be any need to revisit
                that unit (Station/Colony) for next 6 months.

                Case Study:

                DEM Implementation on HT installations over Hyderabad Division

                   Hyderabad Division of South Central Railway is entrusted with the responsibility of HT
                33KV  installations  which  are  catering  40  no‟s  of  LT  11KV  Sub-Stations.  These  LT
                Sub-Stations in turn feed very important Administrative buildings i.e. Rail Nilayam, Lekha
                Bhavan and Sanchalan Bhavan and also two National level Training institutes such as
                IRISET and IRIFM.

                   In  the  month  of  July  2019,  all  the  structures  and  panels  were  inspected  through
                Thermography  with  Thermal  imaging  camera  and  identified  the  hotspots  and  their
                degree  of  deterioration.  Depending  upon  the  degree  of  deterioration  a  calendar  has
                been  chalked  out  and  subsequently  implemented  by  August  2019.  On  observing  the
                trend of power failures, it is known that the graph of power failures has drastically come
                down from Aug - 2019 to Nov - 2019 compared to the last year failures for the same
                period.

















                      Hand held Thermal           Thermal imaging of 4P Structure at      Men at work fulfilling the DEM
                        imaging camera                 Bhoiguda Sub-Station                 objectives