Page 73 - GM booklet 2019 test
P. 73
MECHANICAL
(Carriage & Wagon)
System improvement/developments :-
On 02/05/19, Knuckle boom crane was installed and commissioned on Ashok
Leyland Truck Chassis in IOH Shed/KCG. SSE/IOH along with 5 technicians and 5
khalasis were trained in operation of the knuckle boom crane and the load lifting
trial is conducted in IOH shed.
One set consisting of 05 Nos.of Jamalpur Jacks of 15 Ton capacity has been
received on 19/07/19.
Shri Gajanan Mallya GM/SCR has inaugurated Automatic Coach Washing Plant
(ACWP) at Kacheguda depot on 29.08.19. This plant is the first of its kind on SCR.
63