Salient Features of ACWP:


                 Cost of the plant is 1.26 cr and AMOC cost for 5 years is Rs. 98 lakhs.
                 For one rake to be washed by using ACWP, 1440 litres of fresh water and 5760 litres
                   of recycled water is being used whereas on manual washing 3600 litres of fresh water
                   is being used saving 60% of water.
                 One  operator  per  shift  is  required  to  operate  the  machine  and  one  entire  rake  is
                   getting washed in duration of 15 minutes.
                 The rake has to be moved at a speed of 5 to 8 KMPH for effective cleaning.
                 At Kacheguda depot 132 coaches is being washed every day.

            Bio tanks fitment for Coaches:

            Fitment of Bio-tanks has been done in 30 CBC coaches at KCG depot by M/s JSL Lifestyle
            Ltd, Noida and fitment of bio tanks in SLR coaches is also completed for 17 coaches at KCG
            depot by M/s Venkateswara Agencies on 16.12.2019.

                            No of Coaches       No of coaches
                Total                                                Balance
                                already
             holding of     provided with        provided with        to be               Remarks
                                                  Bio tanks at
              coaches                                               provided
                               Bio Tanks          KCG Depot
                                                                                     For the balance 04
                 468              417                  47               04       coaches, the fitment of Bio
                                                                                 tanks to be done at LGDS.

                                                       Bio-tanks

















                 Fitment  of  156  Nos.  of  Fire  Extinguishers  at  Kacheguda  depot  with  anti-theft
                   arrangement in Non-AC coaches of Tr. No. 17652, 12797 & 17625.

















                 Switched over to generating of on line BPC through CMM for three PM trains (12785,
                   12797 & 17603) from the month of October at Kacheguda depot.