  Inauguration  of  new  Type  III  quarters  (14  Nos)  at  Mahabubnagar  station  by
                   GM/SC on 05.07.2021

















                 Inauguration of Tool cum Rest room for Trackman at Podoor Station by GM/SC
                   on 05.07.2021.




















                 Replacement of old water pipe line from Sheepmandi GLR to Boiguda GLR

                        The existing pipe line which was laid about 100 Yrs back was replaced with new pipe
            line. This old pipeline passes through various encroachments between Sheepmandi GLR to
            Bouguda GLR. There are numerous leakages and unauthorized taping points in this pipeline
            as this pipeline was laid about a century back and now it is highly untraceable. It is very
            tough o attend the leakages and unauthorized taping as the old pipeline existing was highly
            untraceable  and  was  passing  under  several  encroachments  in  secunderabad  area.
            Identification of old pipeline near Boiguda GLR and SC yard is very much required for giving
            the new connection to the old pipeline and also to dummy the old pipeline so as to avoid flow
            of  water  into  the  old  pipeline  in  the  existing  loop.  For  identifying  the  old  pipeline,  most
            sophisticated  methods  such  as  ground  penetration  Radars,  Geophysical  methods,  Cable
            tracing  machines  and  Electro  resistivity  machines  are  used  to  dummy  the  old  pipeline  to
            avoid back flows. But inspite of many efforts it was not traced by the above methods.

                         Finally, assistance of retired valveman, SSE’s and previous DEN/Estates was taken
            and with great difficulty by trial and error methods duly digging the cross trenches, the old
            pipe line has been traced at two locations.

                         The  work  of  replacement  of  Old  pipeline  was  the  most  difficult  and  tedious  work
            which was started two years back as the new water pipeline has to be laid along the cess
            and adjacent to the Track of Secunderabad Station yard. Added to this, there were lot of
            underground  cables  and  site  was  not  feasible  for  movements  of  materials  due  to  non
            availability of approach Roads on either sides.