Page 5 - PH-3000
P. 5
Exp. Exp. %age
PROJECT PB Item Last upto during Anticipate Phy.
SN PH Y-o-S (PB,LB,D Short Name of Work Alloc. Sanc d TDC of REMARKS Status
ID RM) Cost March 2020- Rly portion progres
'20 2021 s of Rly
11.03.30.19. 30 2019- - Hyderabad division - SC-DHNE Section :- RRSK 23642 0 82 31/05/2023 11 Drainage work is in progress. TDC 31/05/2023
WIP
4.52.019 2020 Elimination of Manned LC No. 120 KM 222/900-
64
223/0 by Providing RUB in between MOA-ALPR
Station.
11.03.30.19. 30 2019- - Hyderabad division - SC-DHNE Section :- RRSK 23210 0 0 30/09/2023 0 Tender to be called. TDC 30/09/2023 TT
4.52.020 2020 Elimination of Manned LC No. 156 @ KM
65
281/200-300 by Providing RUB in between VDI-
BVO Station.
11.00.30.18. 30 2018- PB-291 Secunderabd-Mudkhed - Subways in lieu of level RRSK 150039 0 0 31/03/2022 11 LC 245 closed duly completing NI work. Traffic diverted to other WIP
1.52.002 2019 crossings No.245, 246 & 247, Secunderabad- LC gate duly taking permission from GHMC commissioner. Earth
Dhone - level crossing No.11, Sanatnagar-Moula work excavation is in progress. For LC 246 & 247 tender Opened
Ali – level crossing No. BP1, BP2, BP3, BP5 & on 26/11/2020 and is under finalization.
BP7 and Secunderabad - diversion of road from HYB Divn-LC No. 11 separate sanction is available vide ID
66
BP9-LC8 (PB#304/2018-19/SC) No.11.03.30.15.1.52.002. Hence not required. LC 246 and 247
Estimate sanctioned . Tender to be called. LC no. 245 tender
called.
SC Divn 1) LC Nos.BP1, BP2 & BP3-RUBs sanctioned in LSWP
2013-14 & complete. LC
11.03.30.15. 30 2015- PB-203 Hyderabad division- subways in lieu of level S.Fund, 288255 127726 1988 31/05/2021 100 All works completed except drainage work at LC no. 146 due to PHC
67 1.52.001 2016 crossing No. 117, 121, 123, 125, 126, 131, 146, RRSK local farmers problems. TDC 31.05.2021
157, 159 & 161 (10 Nos)
11.03.30.15. 30 2015- PB-207 Secunderabad-Dhone- subways in lieu of level S.Fund, 50104 16900 0 31/03/2022 50 At LC no. 11 RUB Work completed & LC closed in Sept'19. LC WIP
1.52.002 2016 crossing No. 11 & 245 (2 Nos) RRSK 245 closed duly completing NI work. Traffic diverted to other LC
68
gate duly taking permission from GHMC commissioner. Earth
work excavation is in progress at LC 245. TDC 31/03/2022
11.03.30.15. 30 2015- PB-199 Secunderabad-Dhone- subways in lieu of level S.Fund, 292942 141177 40000 30/04/2021 90 At LC no.17,32,36,37,41,43 and at LC 220 work completed and PHC
1.52.003 2016 crossing No. 17, 21, 32, 36, 37, 41,43 RRSK FCC drawn. At LC 21 drainage work is in progress. TDC
69
Secunderabad-Mudkhed- level crossing No. 220 30/04/2021
(8 Nos)
11.03.30.19. 30 2019- LB-203 HYB Divn :Proposed Elimination of Manned LCs RRSK 404144 0 4829 31/08/2024 5 Tender awarded for LC No. 107 and box casting work is in WIP
1.52.008 2020 by RUBs(10Nos) SC-DHNE 07 LCs viz. progress. Balance LC gates tender to be called. TDC
70
31,66,100,107,137,147 & 150. SC-MUE 03 LCs 31/08/2024
viz. 209, 215A & 249.
11.03.30.17. 30 2017- LB-213 SC-DHNE: Elimination of Manned LC No. 56 RRSK 23887 9885 10397 31/03/2021 100 Physically Work Completed and FCC under Process. Work will be PHC
3.52.001 2018 between Mahaboobnagar and Divitipalli stations deleted by 31/03/2021
71
at Km. 108/300-400 by constructing RUB .
11.03.30.17. 30 2017- LB-212 SC-DHNE - Elimination of Manned LC No. 101 E RRSK 22426 13885 52 31/03/2021 100 Physically Work Completed and FCC under Process. Work will be PHC
3.52.010 2018 between Gadwal and Poodoor stations at Km. deleted by 31/03/2021
72
191/4-5 by constructing RUB by open cut
method.
11.03.30.17. 30 2017- LB-214 SC-MUE :- Elimination of Manned LC No. 194 RRSK 23827 15278 2975 30/04/2021 90 LC closed in Nov'18. Drainage, Wing walls completed. Road work, PHC
73 3.52.011 2018 between NZB and DHP stations at Km. Height gauge & flood protection works are in progress. Work will
467/400-500 by constructing RUB. be deleted by 30/04/2021
11.03.30.17. 30 2017- LB-215 SC-MUE :- Elimination of Manned LC No. 192A RRSK 21926 14983 1180 30/04/2021 95 LC closed in Nov'18. Drainage, Wing walls completed. Road work, PHC
74 3.52.012 2018 between NZB and DHP stations at Km. Height gauge & flood protection works are in progress. Work will
464/600-700 by constructing RUB. be deleted by 30/04/2021.
11.03.30.17. 30 2017- LB-216 SC-MUE :- Elimination of Manned LC No. 164 RRSK 24604 6882 15 30/04/2022 30 Work delayed due to state govt(MHA) modified the BOX vent size WIP
75 3.52.013 2018 between SVN and UMRI stations at Km. (from 1x6x4.65 To 2x5x5.5m).Box casting is in progress. TDC
388/700-800 by constructing RUB. 30/04/2022.