Page 5 - PH-3000
P. 5

Exp.   Exp.           %age
             PROJECT           PB Item                                         Last   upto   during   Anticipate  Phy.
        SN            PH Y-o-S (PB,LB,D       Short Name of Work        Alloc.  Sanc              d TDC of                          REMARKS                     Status
                ID              RM)                                            Cost  March   2020-  Rly portion  progres
                                                                                       '20  2021           s of Rly
            11.03.30.19.  30  2019-  -  Hyderabad division - SC-DHNE Section :-  RRSK  23642  0  82  31/05/2023 11  Drainage work is in progress. TDC 31/05/2023
  WIP
            4.52.019       2020      Elimination of Manned LC No. 120 KM 222/900-
         64
                                     223/0 by Providing RUB in between MOA-ALPR
                                     Station.
            11.03.30.19.  30  2019-  -  Hyderabad division - SC-DHNE Section :-  RRSK  23210  0  0  30/09/2023 0  Tender to be called.  TDC 30/09/2023          TT
            4.52.020       2020      Elimination of Manned LC No. 156 @ KM
         65
                                     281/200-300 by Providing RUB in between VDI-
                                     BVO Station.
            11.00.30.18.  30  2018- PB-291 Secunderabd-Mudkhed - Subways in lieu of level RRSK  150039  0  0  31/03/2022 11  LC 245 closed duly completing NI work. Traffic diverted to other   WIP
            1.52.002       2019      crossings No.245, 246 & 247, Secunderabad-                                  LC gate duly taking permission from GHMC commissioner.  Earth
                                     Dhone - level crossing No.11, Sanatnagar-Moula                              work excavation is in progress. For LC 246 & 247 tender Opened
                                     Ali – level crossing No. BP1, BP2, BP3, BP5 &                               on 26/11/2020 and is under finalization.
                                     BP7 and Secunderabad - diversion of road from                               HYB Divn-LC No. 11 separate sanction is available vide ID
         66
                                     BP9-LC8 (PB#304/2018-19/SC)                                                 No.11.03.30.15.1.52.002. Hence not required. LC 246 and 247
                                                                                                                 Estimate sanctioned . Tender to be called. LC no. 245 tender
                                                                                                                 called.
                                                                                                                 SC Divn 1) LC Nos.BP1, BP2 & BP3-RUBs sanctioned in LSWP
                                                                                                                 2013-14 & complete. LC
            11.03.30.15.  30  2015- PB-203 Hyderabad division- subways in lieu of level   S.Fund, 288255  127726 1988  31/05/2021 100  All works completed except drainage work at LC no. 146 due to   PHC
         67  1.52.001      2016      crossing No. 117, 121, 123, 125, 126, 131, 146,  RRSK                       local farmers problems. TDC 31.05.2021
                                     157, 159 & 161 (10 Nos)
            11.03.30.15.  30  2015- PB-207 Secunderabad-Dhone- subways in lieu of level   S.Fund, 50104  16900  0  31/03/2022 50  At LC no. 11 RUB Work completed & LC closed in Sept'19. LC   WIP
            1.52.002       2016      crossing No. 11 & 245 (2 Nos)     RRSK                                      245 closed duly completing NI work. Traffic diverted to other LC
         68
                                                                                                                 gate duly taking permission from GHMC commissioner.  Earth
                                                                                                                 work excavation is in progress at LC 245. TDC 31/03/2022
            11.03.30.15.  30  2015- PB-199 Secunderabad-Dhone- subways in lieu of level   S.Fund, 292942  141177 40000  30/04/2021 90  At LC no.17,32,36,37,41,43 and at LC 220 work completed and   PHC
            1.52.003       2016      crossing No. 17, 21, 32, 36, 37, 41,43   RRSK                               FCC drawn. At LC 21 drainage work is in progress. TDC
         69
                                     Secunderabad-Mudkhed- level crossing No. 220                                30/04/2021
                                     (8 Nos)
            11.03.30.19.  30  2019- LB-203 HYB Divn :Proposed Elimination of Manned LCs  RRSK  404144  0  4829  31/08/2024 5  Tender awarded for LC No. 107 and box casting work is in   WIP
            1.52.008       2020      by RUBs(10Nos) SC-DHNE 07 LCs viz.                                          progress. Balance LC gates tender to be called. TDC
         70
                                     31,66,100,107,137,147 & 150. SC-MUE 03 LCs                                  31/08/2024
                                     viz. 209, 215A & 249.
            11.03.30.17.  30  2017-  LB-213 SC-DHNE: Elimination of Manned LC No. 56   RRSK  23887  9885  10397  31/03/2021 100  Physically Work Completed and FCC under Process. Work will be  PHC
            3.52.001       2018      between Mahaboobnagar and Divitipalli stations                              deleted by 31/03/2021
         71
                                     at Km. 108/300-400  by constructing RUB .
            11.03.30.17.  30  2017-  LB-212 SC-DHNE - Elimination of Manned LC No. 101 E  RRSK  22426  13885  52  31/03/2021 100  Physically Work Completed and FCC under Process. Work will be  PHC
            3.52.010       2018      between Gadwal and Poodoor stations  at Km.                                 deleted by 31/03/2021
         72
                                     191/4-5  by constructing RUB by open cut
                                     method.
            11.03.30.17.  30  2017-  LB-214 SC-MUE :- Elimination of Manned LC No. 194    RRSK  23827  15278  2975  30/04/2021 90  LC closed in Nov'18. Drainage, Wing walls completed. Road work,  PHC
         73  3.52.011      2018      between NZB  and DHP stations  at Km.                                       Height gauge & flood protection works are in progress. Work will
                                     467/400-500  by constructing RUB.                                           be deleted by 30/04/2021
            11.03.30.17.  30  2017-  LB-215 SC-MUE :-  Elimination of Manned LC No. 192A   RRSK  21926  14983  1180  30/04/2021 95  LC closed in Nov'18. Drainage, Wing walls completed. Road work,  PHC
         74  3.52.012      2018      between NZB  and DHP stations  at Km.                                       Height gauge & flood protection works are in progress. Work will
                                     464/600-700  by constructing RUB.                                           be deleted by 30/04/2021.
            11.03.30.17.  30  2017-  LB-216 SC-MUE :- Elimination of Manned LC No. 164    RRSK  24604  6882  15  30/04/2022 30  Work delayed due to state govt(MHA) modified the BOX vent size  WIP
         75  3.52.013      2018      between SVN  and UMRI stations  at Km.                                      (from 1x6x4.65 To 2x5x5.5m).Box casting is in progress. TDC
                                     388/700-800  by constructing RUB.                                           30/04/2022.
   1   2   3   4   5