Page 1 - MECHANICAL POWER
P. 1

MECHANICAL (POWER)
               1.0 Brief description: Mechanical (power) organisation is functioning under the control of
                   Sr.DME/HYB with 3 Crew depots (KCG, NZB and GWD), one running room, 3 Rest
                   Rooms and one RCD at KCG.

                1.1 Depot wise crew working beats.

                    DEPOT                      COACHING                                GOODS

                                    SC/HYB-DHNE-SC/HYB                   KCG-DHNE-KCG/MLY/SNF
                                    HYB/SC-PAU-SC/HYB                    MLY-NZB-MLY
                      KCG
                                    GWD-RC-GWD                           KCG-CHZ-KCG
                                    MBNR-JKRL-MBNR

                                                                         NZB-MLY/SNF-NZB
                                    NZB-PAU-NZB                          NZB-PAU-NZB
                      NZB           NZB-BDHN-NZB                         NZB-BDHN-NZB
                                    NZB-KRMR-NZB
                                                                         NZB-KRMR-NZB
                                                                         GWD-DHNE-GWD
                      GWD                            -                   GWD-KCG-GWD
                                                                         GWD-RC-GED

                1.2 Combined crew booking lobbies:

                     Crew booking lobbies are available at KCG, NZB and GWD.
                     Computerized booking of Loco Pilots and Guards are combined at all the lobbies.
                     All  the  3  lobbies  are  renovated  and  provided  with  furniture,  amenities  like
                       Water cooler with R.O system etc.
                     Self-evaluation  software  like  “Gyan  Deep”  made  available  for  the  purpose  of
                       educating the loco running staff.
                     Crew Management System developed  by  CRIS/New  Delhi  was commissioned
                       in    the    lobbies    (KCG,  NZB  and  GWD)    in    the    division.  CMS  terminal  was
                       provided at KRNT 100% CMS w.e.f., 01.10.2014.
                     All  the  CMS  Kiosks  are  integrated  BA  system  and  Webcams  for  the  crew  to
                       undergo BA test during sign ON and OFF.


                1.3 Running rooms/ rest rooms:

                       Following is the position of running rooms in the division and their bed strength:

                       a.  Running rooms:

                           Location          No.of Rooms             No.of Beds        Peak occupancy
                             NZB                   20                    60               40 (67%)
                             KCG                    3                    17               17 (100%)

                                                                                                  Page 1 of  5
   1   2   3   4   5