Page 3 - Our legacy and Achievements.pdf
P. 3
III In view of COVID 19, a robot called
“Hospital Assistant” for Non Contact
Temperature measurement in Corona
ward ensuring minimum human
interface has been developed at a cost
of Rs.89,680 and handed over to
CH/LGD of SCR. It has provision of
carrying medicine, food and other items
to patients. It has been provided with
emergency light, night vision camera
and sound systems which enables
doctors to communicate with the
patients without directly approaching
them.
IV In all the coaches fitted with Dellner
make AAR compatible couplers, Lock
Pin was provided as per RDSO
guidelines. Out of 57 CBC coach
holdings, 16 coaches of Dellner make
coupler coaches were provided with
positive locking pin arrangement.
V KCG, NZB & BSX Railway Stations have received TSPCB consent for
Establishment and consent for operation under Air and Water Pollution Act.
VI Freight Management Module (FMM) has been installed at NZB depot. BPCs were
issued for 5 trains after End to End examination using FMM.
VII Coaching depot, Kacheguda has taken initiative for replacing the defective thumb
springs of venation shutters of emergency windows. A total of 98 defective springs
were replaced.
VIII A full scale technical mock drill exercise on Train Accidents was conducted along
with NDRF staff at Bolarum on 13.02.2021. The entire relief and rescue operation
was completed in 45min.
IX Hyderabad division has achieved Environment shield for the year 2019-20.
59