Good work done optimally utilizing Covid Period
Face Masks
2400 Nos of face masks were stitched by departmental staff using old linen.
Preparation of face masks by Railway staff
Distribution of Food and other essential items to the contract staff by Officers and
supervisors.
Food distribution by Officers and Staff.
MMTS coach movement
The accident involved power car of MMTS sent to LGDS workshop from KCG on
15.05.2020 to attend repairs. Initially difficulty was faced as there was no provision for
coupling and also there were chances of infringement of sole bars into engine. The
problems were rectified with the guidance of mechanical, traction and operating
department. SSE/General/KCG and SSE/Mobile ART along with staff and re-railing
equipments accompanied the coach with walking speed to LGD workshop.
Mock drill for Preparedness of ART/MRVs in view of COVID-19 conducted at NZB
on 29.04.2020 and 14.10.2020. Sanitation of ART/NZB and SPMRV/NZB coaches is
being done regularly.
Temperature reading with contactless Thermo meter Sanitation of ART/SPMRV