Page 4 - Our legacy and Achievements.pdf
P. 4

Good work done optimally utilizing Covid Period


                 Face Masks
                   2400 Nos of face masks were stitched by departmental staff using old linen.










                                                             Preparation of face masks by Railway staff
                 Distribution of Food and other essential items to the contract staff  by Officers and
                   supervisors.











                                                                                                                                                                                                                                               Food distribution by Officers and Staff.





                  MMTS coach movement
                   The  accident  involved  power  car  of  MMTS  sent  to  LGDS  workshop  from  KCG  on
                   15.05.2020 to attend repairs. Initially difficulty was faced as there was no provision for
                   coupling and also there were chances of infringement of sole bars into engine. The
                   problems  were  rectified  with  the  guidance  of  mechanical,  traction  and  operating
                   department. SSE/General/KCG  and SSE/Mobile  ART  along  with  staff and  re-railing
                   equipments accompanied the coach with walking speed to LGD workshop.


                 Mock drill for Preparedness of ART/MRVs in view of COVID-19 conducted at NZB
                   on 29.04.2020 and 14.10.2020. Sanitation of ART/NZB and SPMRV/NZB coaches is
                   being done regularly.








                    Temperature reading with contactless Thermo meter           Sanitation of ART/SPMRV


                                                            60
   1   2   3   4   5   6   7