Page 10 - Our legacy and Achievements.pdf
P. 10

  Improvement works done at RRC pavilion at Secunderabad-

               i.  Replaced AC sheets with Galvolium sheets along with Stainless steel gutters.
               ii.  Provided flooring with Shahabad stone with slope towards grating and water.
               iii.  Improved drainage system by providing 600mm dia pipe with grating in corridor
               iv.  Grading done on front and rear verandahs
               v.  Water cooler in pavilion is shifted and provided with separate shed
               vi.  Hand rails strengthened and railings provided over Pavilion
               vii. Lappam finish done in the pavilion.
               viii. Outside texture finish removed and attended all repairs along with painting.





























                                            Improvement works at RRC pavilion


            12. Precautions / Good works done to combat Covid-19

                 Provision of isolation beds in Railway Central Hospital / Lallaguda

            Provided of isolation beds (150 Nos) in ward Nos 4,5,6,7,9&Gynaec wards of Railway
            Central Hospital / Lallaguda















                                                Isolation wards in CH/LGD.






                                                            28
   5   6   7   8   9   10   11   12   13   14   15