Improvement works done at RRC pavilion at Secunderabad-
i. Replaced AC sheets with Galvolium sheets along with Stainless steel gutters.
ii. Provided flooring with Shahabad stone with slope towards grating and water.
iii. Improved drainage system by providing 600mm dia pipe with grating in corridor
iv. Grading done on front and rear verandahs
v. Water cooler in pavilion is shifted and provided with separate shed
vi. Hand rails strengthened and railings provided over Pavilion
vii. Lappam finish done in the pavilion.
viii. Outside texture finish removed and attended all repairs along with painting.
Improvement works at RRC pavilion
12. Precautions / Good works done to combat Covid-19
Provision of isolation beds in Railway Central Hospital / Lallaguda
Provided of isolation beds (150 Nos) in ward Nos 4,5,6,7,9&Gynaec wards of Railway
Central Hospital / Lallaguda
Isolation wards in CH/LGD.
28