Page 5 - P S - Mech Power
P. 5

Steps taken to combat COVID-19:

               At Crew lobbies and Running rooms:

                      i.   As per the instructions from HQr Freight trains, Shramik specials and Employees
                           special  trains  had  been  operated  to  meet  the  transportation  of  goods  and
                           Employees/Shramik.
                     ii.   All  the  instructions  issued  timely  from  HQrs  have  been  conveyed  to  all  the
                           Running staff in regard to the booking of trains, procedure to be followed while
                           reporting Sign ON duty and Sign Off duty is strictly followed.
                     iii.   All  the  Crew  lobbies  of  the  division  are  supplied  with  sanitation  materials  and
                           being  sanitized  often  to  keep  the  crew  lobby  premises  clean  and  tidy  as
                           precautionary measure.
                     iv.   All  the  Running  Rooms  of  the  division  are  supplied  with  sanitation  materials.
                           Sanitization  done  frequently  during  crew  changing  time  and  necessary
                           precautions are being taken and ensured as instructed timely by the HQrs.
                     v.    Survey of running staff/relatives of the staff returned from foreign tour has been
                           conducted and the data submitted timely to the nodal officer.
                     vi.   Sanitization  of  all  the  locomotives  during  crew  changing  is  being  ensured  at
                           KCG, NZB and GWD as a precautionary measure.
                    vii.   Sanitation  materials  like  liquids,  hand  wash  solution/soaps,  face  masks
                           were  made  available  at  crew  lobbies  and  supplied  to  the  crews  to  use  as
                           precautionary measure.
                    viii.   Refresher    courses    in    Electrical,    Diesel    Traction    and    G&SR    is    being
                           attended online by Running staff.

               Details of Diesel Traction operations:

               Details of RCDs:

               1)   RCDs: There is one RCD at KCG. It has got the facility to supply fuel in Diesel locos &
                    Power cars in all platforms of KCG station. Earlier, there were  17  fuelling  points  in  all
                    05  platforms  in  KCG  Station. 4 CCTV Cameras have been provided in RCD/KCG to
                    ensure proper monitoring of activities and to avoid any irregularity.

               Storage facility:
                                                                                 Avg. issues     Avg. no. of
                                   Tank          Storage           Date of         per day       locos filled
                   Depot
                                  Number         capacity      commissioning     (2020-2021)       per day
                                                                                    In KL        (2020-21)
                                     1            70 KL       25.04.2008
                    KCG              2            70 KL       19.06.2008            70 KL            20
                                     3            250 KL      29.10.2009

               Average fuel issues: (2020-21)
                                                      Traction issues                Non traction issues
                                                                                                No. of power
                          Issues                                                   Qty (lts)
                                                 Qty (lts)    No. of locos                           cars

               KCG: Avg. issues/month           31189.98           13.57           3952.52           2.80

                                                            158
   1   2   3   4   5   6   7