Page 49 - Safety Memo
P. 49

Job Hazard Analysis Evaluation Form


                    The purpose of this two-page form is to allow Superintendents to
                   effectively and efficiently validate the acceptality of a subcontractor’s

                                                Job Hazard Analysis submittal

                   Evaluator:         Print                                     Signature




            Date Evaluated:

            Job Site name /number:

            Subcontractor Name:

            Work Scope:



            Projected Work Start Date:

            Subcontractor’s JHA Name / Number:

                   Approval Signature                          Approver Name                    Approval Date





             THE FOLLOWING “ CONSTRUCTION SUPERINTENDENT JHA CHECKLIST” SUMMARIZES
                        THE FINDINGS OF THE SUBCONTRACTOR JHA THAT IS NOTED ABOVE.
   44   45   46   47   48   49   50   51   52   53   54