Page 34 - 1. 20201116 KL TMA - New Airspace Introduction_Neat
P. 34

Triple Runway operation




                      The altitude and descend profile in the Initial Approach Segments

                      vary with the intended landing runway.



                      The Initial approach segment from each PMS is designed to link to all

                      three Runways for ILS/LOC approach or RNP GNSS approach.




                      For Triple Runway operation, PMS East manages traffic for
                      RWY32R , PMS south manages RWY 32L and PMS West manages

                      RWY33 for RWY 32/33 configuration; and PMS East manages RWY
                      14L, PMS North manages RWY 14R and PMS West manages RWY

                      15 for RWY 15 /14 configuration.




                      The RNAV STARs designed for each runway at WMKK are
                      permitting IPA operations because their vertical paths are separated of

                      1000ft until the aircraft are established on the localizer course or the
                      Final Approach Track GNSS inside the NOZ.






              enavasiapacific.com                                                                                                         34