Page 36 - 1. 20201116 KL TMA - New Airspace Introduction_Neat
P. 36
Dual Runway operation
The “low side” runway must always maintain the “low side” altitude
by the base turn or a point designed before the IF.
If “middle side” and “high side” runway are operating in pair, the
“middle side” shall always ensure reaching the “middle side” altitude
before base turn or at a point designed before the IF.
For Dual Runway Operation, the Default PMS in use are PMS East
and PMS West to cater for the operation of RWY32/33 and
RWY15/14 Scenario. Controller has the option to use PMS North
and PMS South to replace one of the default PMS when required due
to significant WX condition and other technical reasons.
Caution: Current procedure design does not allow
Independent Simultaneous Parallel Approach from PMS North for
RWY 15 and PMS East for RWY 14R.
enavasiapacific.com 36

