Pile Groups
Piles are usually arranged in groups under the columns.
The number of piles in a group is determined as follows:
N Pc *1.10
Qall
Where:
N = No. of piles;
Pc = Column Load;
Qall = Allowable load of
a single pile.
Arrangement of Pile Groups
The spacing between piles in a group can be
assumed based on the following:
1- Driven piles need higher spacing than bored
piles.
2- Friction piles need higher spacing than end
bearing piles.
3- Minimum spacing (S) between piles is 2.0D.
4- Maximum spacing (S) between piles is 8.0D.
5- Piles are usually spaced (2.5 to 3)D on center.
17 August 2021 40
20