Page 11 - Draft_Copy.doc
P. 11
Retain walls are not included in this agreement
3.9. Payment schedule.
The Owner shall pay to the Builder the following amount of the total cost of the
contract for the Works as agreed upon between the Builder and the Owner.:
Total Area :- sf + sf = sf
Total Cost :- = LKR
#. Descriptions Amount (LKR) Total(LKR)
01. Retaining wall xxxx xxxx
02. Foundation and structure upto slab xxxx xxxx
03. Slab (under ground) xxxx xxxx
04. Foundation II xxxx xxxx
05. Wood Initial xxxx xxxx
06. Brick Work (Ground Floor) xxxx xxxx
07. Slab (Ground Floor) xxxx xxxx
08. Brick Work (First Floor) xxxx xxxx
09. Slab (First Floor) xxxx xxxx
10. Brick work (2nd floor) xxxx xxxx
11. Slab (2nd Floor) xxxx xxxx
12. Plaster wiring and Plumbing (Ground Floor) xxxx xxxx
13. Plaster wiring and Plumbing (First Floor) xxxx xxxx
14. Plaster wiring and Plumbing (2nd Floor) xxxx xxxx
15. Under Ground Plaster tilling ground floor xxxx xxxx
16. Putty Tilling 1st floor xxxx xxxx
17. Putty Tilling 2nd floor xxxx xxxx
18. Wood work xxxx xxxx
End Of the Project xxxx xxxx
Contract between Owner and Builder