3.7.7.1 List of works to be done.
Foundation works.
Brick works.
Slab and Roofing
Plastering
Doors & Windows – TEAK (State Timber Cooperation)
Frame and panel only.
Wiring up to plastering level.
Labor cost for fixing all electrical fixtures.
Plumbing up to plastering level (hot and cool).
Labor cost for fixing all plumbing fixtures.
Staircase. (Concrete )
Labor (cost) for tilling (Ceramic Tile, Porcelain Tile, )
Labor (cost) for applying putty and fillers
3.7.7.2 List of work which NOT includes
Excavation
Ceiling works
Wall covering (wall paper)
Tile (Wood floor, Glass Tile, Marble, Granite, Limestone Tile)
Grill For windows
Glass
Boundary wall and Retaining wall
Paint
Pantry
Gardening
Waste water pit
Wall tilling
Etc.
3.7.7.3 List of material which supply by the owner
Tile and tile moto .
Plumbing Fixtures ( Tap, Sink, Drains Etc..)
Electrical Fixtures (Lighting fixtures, Switchers(Outlet) Etc..)
Door & Window Fixtures (Hinges, lock, Fastener, Etc..)
Glass.
Putty and fillers.
Wood for Stair.
Contract between Owner and Builder