Satker     : Pelaksanaan Jalan Nasional Wilayah I Provinsi Jambi
                     Paket      : Preservasi Jalan Sp. Tuan - Bts. Kab. Muaro Jambi - Sp. Tiga Batara Gas Plant
                                : (Pematang Lumut) - Kuala Tungkal dan Jalan Dalam Kota Kuala Tungkal.
                     Penyedia Jasa  : PT. Abun Sendi
                     Konsultan  : PT. Progresia Aditya Pratama KSO. PT. Guteg Harindo


                                              SUMMARY OF JOB MIX FORMULA
                                                    Laston Lapis Antara  (AC-BC)
                    A. Composition Of Mix
                                    TOTAL AGGREGATE                              TOTAL MIX
                    NO
                              COLD BIN            HOT BIN               COLD BIN              HOT BIN
                     1   Coarse Agg  :  34.00  %  Hot Bin 1  :  40.00  %  Coarse Agg  :  32.06  %  Hot Bin 1  :  37.72  %
                     2   Medium Agg :  25.00  %  Hot Bin 2  :  21.00  %  Medium Agg  :  23.58  %  Hot Bin 2  :  19.80  %
                     3   Abu Batu   :  25.00  %  Hot Bin 3  :  27.00  %  Abu Batu   :  23.58  %  Hot Bin 3  :  25.46  %
                     4   Pasir   :  14.00  %  Hot Bin 4  :  10.00  %  Pasir  :  13.20  %  Hot Bin 4  :  9.43  %
                     5   Filler  :  2.00  %  Filler   :  2.00  %  Filler    :  1.89  %  Filler   :  1.89  %
                     6   Aspal   :   -   %  Aspal    :    -  %  Aspal       :  5.70  %  Aspal    :  5.70  %
                         Total     100.00  %           100.00  %            : 100.00  %            100.00  %


                    B. Gradation Mix From Hot Bin
                    NO       SIEVE SIZE       1"   3/4"  1/2"  3/8"  # 4  # 8  # 16  # 30  # 50  # 100 # 200

                     7    Combine Aggregate  100.0  97.17  83.82  73.60  49.97  43.59  28.10  17.87  11.14  6.70  5.46
                                                        Gradation OF AC-BC
                                            100.0 100.00 90.00  82.00  64.00  49.00  38.00  28.00  20.00  13.00  8.00
                                            100.0  90.00  75.00  66.00  46.00  30.00  18.00  12.00  7.00  5.00  4.00

                    C. Marshall Properties
                    NO              MIX PROPERTIES               UNIT       TEST RESULT       SPECIFIKASI
                     8   Void In Mineral Aggreagate (VMA)         %            15.52           Min. 14.0
                     9   Void In Filled Bitument (VFB)            %            74.89            Min. 65
                    10  Void Mix At Refusal Density               %            3.52            Min. 2,0
                    11  Stability Marshall                        Kg           1,022           Min. 800,0
                    12  Marshall Flow                            mm            3.08            2,0 - 4,0
                    13  Marshall Qoutient                       KN/mm           317               -
                    14  Reteined Marshall Stability               %           91.43%           Min. 90.0
                    15  Void In Mix                               %            3.90          Min. 3,0 - 5,00
                    16  Max Density                             gr/cm³         2.299              -

                    KETERANGAN  : JMF AC - BC Menggunakan Anti Striping Agent Sebesar 0.25 % Terhadap Berat Asphalt
                                yang digunakan



                         PENYEDIA JASA :                 KONSULTAN :                      BINA MARGA :





                          ALFIYAH, ST                 Ir. IDA SUKARIANA                    HENRY, ST
                       General Superintendent            Quality Engineer             Nip. 197301132009111002