JOB GRADING LASTON LAPPIS ANTARA (AC~BC)
KOMPOSISI MATERIAL DALAM CAMPURAN
Satker : Pelaksanaan Jalan Nasional Wilayah I Provinsi Jambi
Paket : Preservasi Jalan Sp. Tuan - Bts. Kab. Muaro Jambi - Sp. Tiga Batara Gas Plant
: (Pematang Lumut) - Kuala Tungkal dan Jalan Dalam Kota Kuala Tungkal.
Penyedia Jasa : PT. Abun Sendi
Konsultan : PT. Progresia Aditya Pratama KSO. PT. Guteg Harindo
% AGG. DALAM CAMPURAN GRA SPECIFIKASI
SIEVE SIZE GRADASI AGG ( % LOLOS ) DASI
GABU GRADASI
HOT BIN T BIN T BIN T BIN NGAN
O
O
H
O
H
H
I II III IV FILLER %
H
O
B
HOT BIN T BIN T BIN HOT BIN BATAS ATAS
H
O
INCH MM FILLER
I II III IV BAWAH ATAS
40.00 21.00 27.00 10.00 2.00 100.00
1" 25.4 100.00 100.00 100.00 100.00 100.0 40.00 21.00 27.00 10.00 2.00 100.00 100.00 100.00
3/4" 19.1 100.00 100.00 99.70 72.52 100.0 40.00 21.00 26.92 7.25 2.00 97.17 90.00 100.00
1/2" 12.7 100.00 99.78 68.07 24.85 100.0 40.00 20.95 18.38 2.49 2.00 83.82 75.00 90.00
3/8" 9.50 100.00 95.61 37.09 15.07 100.0 40.00 20.08 10.01 1.51 2.00 73.60 66.00 82.00
# 4 4.76 100.00 23.84 8.46 6.75 100.0 40.00 5.01 2.28 0.68 2.00 49.97 46.00 64.00
# 8 2.38 95.46 9.15 3.64 5.02 100.0 38.18 1.92 0.98 0.50 2.00 43.59 30.00 49.00
# 16 1.19 60.62 8.00 0.25 1.02 100.0 24.25 1.68 0.07 0.10 2.00 28.10 18.00 38.00
# 30 0.600 35.78 7.42 0.00 0.00 100.0 14.31 1.56 0.00 0.00 2.00 17.87 12.00 28.00
# 50 0.300 19.82 5.78 0.00 0.00 100.0 7.93 1.21 0.00 0.00 2.00 11.14 7.00 20.00
# 100 0.150 9.45 4.48 0.00 0.00 99.00 3.78 0.94 0.00 0.00 1.98 6.70 5.00 13.00
# 200 0.075 6.85 3.61 0.00 0.00 98.00 2.74 0.76 0.00 0.00 1.96 5.46 4.00 8.00
200 100 50 30 16 8 4 3/8"1/2" 3/4" 1"
100.00
90.00
80.00
PERSEN (%) LOLOS 60.00
70.00
50.00
40.00
30.00
20.00
10.00
0.00
PENYEDIA JASA : KONSULTAN : BINA MARGA :
RAHMAT RIDUAN HARUN ARONI
Quality Control Lab Technician Nip. 196608222006041003