Figure 4.2: Expected maintenance costs due to the floods in the period of 28-06-2012 to
07-05-2012 in percentage to the traditional costs.
These results shown in figure 4.3 are indicative to give an impression of the reconstruction
costs for the specific roads. The costs shown in figure 4.3 are based on reconstruction costs of
the road. The reconstruction costs for longer damaged parts are higher than for the shorter
parts.