Page 53 - Microsoft Word - 20120528 Unesco study
P. 53

Figure 4.4:   Expected reconstruction period for the flooded roads in the period of 28-06-2011 till
                                   07-05-2012










                                                                                                     52
   48   49   50   51   52   53   54   55   56   57   58