5.2  Conclusions
                  To determine the macro-economic effects of the PowerCem technology in flood risk areas,
                  PowerCem Technologies in close collaboration with UNESCO-IHE has developed a model
                  wherein with local data as input; accurate output estimations can be made.

                  The results obtained in this study are based on the extent of floods from the period of 28-06-
                  2011 to 07-05-2012. Based on the extent of these floods, the amount of roads located in the
                  flooded areas are determined.

                                                           Flooded roads
                                             Soil type  Soil type  Soil type  Soil type
                  Type of road
                                                1       2        3       4     Totals
                                               [m]     [m]      [m]     [m]      [m]
                  Roadtype 1 Highways           3.827       0       0       0    3.827
                  Roadtype 2 Primary roads    139.008   4.316       0   10.602  153.926
                  Roadtype 3 Secondary roads  120.790  19.427    3.192   2.667  146.076
                  Roadtype 4 Rural roads      837.955  64.045    6.767  156.401 1.065.168
                  Roadtype 5 Access roads      43.802   1.686       0   11.922  57.410
                  Total                      1.145.382  89.474   9.959  181.592 1.426.407
                             Table 5.1:  Flooded roads based on the flood extents

                  The location of the flooded roads in the reference period is shown in figure 5.1.






































                           Figure 5.1:   Flood extents with road network in the period of 28-06-2011 till 07-05-2012