5.2 Conclusions
To determine the macro-economic effects of the PowerCem technology in flood risk areas,
PowerCem Technologies in close collaboration with UNESCO-IHE has developed a model
wherein with local data as input; accurate output estimations can be made.
The results obtained in this study are based on the extent of floods from the period of 28-06-
2011 to 07-05-2012. Based on the extent of these floods, the amount of roads located in the
flooded areas are determined.
Flooded roads
Soil type Soil type Soil type Soil type
Type of road
1 2 3 4 Totals
[m] [m] [m] [m] [m]
Roadtype 1 Highways 3.827 0 0 0 3.827
Roadtype 2 Primary roads 139.008 4.316 0 10.602 153.926
Roadtype 3 Secondary roads 120.790 19.427 3.192 2.667 146.076
Roadtype 4 Rural roads 837.955 64.045 6.767 156.401 1.065.168
Roadtype 5 Access roads 43.802 1.686 0 11.922 57.410
Total 1.145.382 89.474 9.959 181.592 1.426.407
Table 5.1: Flooded roads based on the flood extents
The location of the flooded roads in the reference period is shown in figure 5.1.
Figure 5.1: Flood extents with road network in the period of 28-06-2011 till 07-05-2012