Page 60 - Microsoft Word - 20120528 Unesco study
P. 60
Figure 4.10: Amount flood proof roads given in meters during the reference period
In figure 4.11 are the maintenance costs shown over a reference period of 10 years.
Figure 4.11: Maintenance costs Traditional versus RoadCem
In figure 4.6 it is shown that the PowerCem Technology will offer an enormous economic
advantage over a longer term. However these results are based on certain scenarios, the
potential will be high. And further research on this subject will be recommended.
59