Figure 4.10: Amount flood proof roads given in meters during the reference period

                  In figure 4.11 are the maintenance costs shown over a reference period of 10 years.

































                        Figure 4.11:   Maintenance costs Traditional versus RoadCem

                  In figure 4.6 it is shown that the PowerCem Technology will offer an enormous economic
                  advantage over a longer term. However these results are based on certain scenarios, the
                  potential will be high. And further research on this subject will be recommended.