Chapter  3        DESIGN               117


               Project Requirements:


                      x           x             x           x               x
                                                              95.5                       x
                        95.5         95.8         95.8                      95.3           96.0




                     x            x
                       96.0         96.0       x   96.0     x   95.8      x             x
                                                                            95.5           95.5





                    x             x           x             x             x             x
                       96.8          96.5        96.5          96.5         96.5           95.8




                    x            x            x            x             x              x
                      96.5         96.8         96.8          97.0         97.0           96.5

                                                  Proposed finished
                                                  ground floor
                                                  elev.  97.5 ft.
                    x           x            x             x               x                      Lot 350.0 ft.
                      97.0         97.0         97.0         97.0         96.5           x

                                                                                           96.0



                    x          x             x                x         x               x
                      96.5        96.0         96.0           96.0        96.0            96.0






                      95.8       95.5          95.5
                    x         x             x              x  95.5       x  95.8        x  95.5

                                                                                                  Bench Mark
                                                                                                  nail spike on
                       Lot 265.0ft.                                                               hydro pole
                                                              Elev. on pavement at                = 100.0 ft.
                                                              ctr.of roadway = 96.8
                                                     x


                                                                              ACME   MANUFACTURlNG
                                                           Topograph c Survey (grid 50.0  ft. x 50.0  ft.)
   136   137   138   139   140   141   142   143   144   145   146