                                                       ❖ A brief overview of the project

                                                       Topic  –  Design  of  Critical  Spare  parts  inventory  model  –
                                                       Machine breakdowns can occur sporadically at any time of a
                                                       machine’s life. Subsequently spare parts must be available to
                                                       repair it and make it up and running as soon as possible to
                                                       reduce downtime and improve productivity. Hence there was
                                                       a need of a model to forecast the expected demand of spare
                                                       parts of equipment, determine the reorder quantity, re-order
                                                       interval  and  safety  stock  requirement  and  subsequently
                                                       automate it so that it can be run over the years for inventory
                                                       planning.

                                                       Study  of  possible  losses  in  blending  and  filling operations –
                ABHIJNAN LAHIRI                        Identify the different points in the entire blending and filling

                                                       operations  of  lubricants  where  losses  were  occurring  and
                      CASTROL
                                                       finding out possible solutions for them.
          __________________________________________

           GENERAL INFORMATION                         ❖ How is a normal day at the Internship?


                  Batch: PGDIE 48                      My working hours per day was from 9am-5pm on a typical day
                                                       but  depending  upon  the  daily  work  and  as  my  project
              BTech: National Power                    progressed, I had to extend my time at office till 8-9pm. I was

                                                       mostly  involved  in  interactions/conversations  with  the
               Training Institute (E.R)                employees  and  technicians  to  gather  data  and  insights

                                                       regarding the issues needed for the project in the initial days.
           Stream: Power Engineering
                                                       After gathering data, I spent my days in my “dedicated” office
          Work Ex: Tata power company                  cabin beside my mentor to work on the model and come up
                                                       with results.


     Having made quite a lot of acquaintances at the office in different departments, it was quite fun to work and

     spend time at the office. Being a young student, all employees used to be fond of me and acknowledged my
     company with them. Time used to fly by smoothly between project work and chitchat with the people there.



     ❖ What are the challenges faced during Internship?


     The most frustrating challenge faced during the project was data collection. I believe this is the biggest challenge

     faced by any intern in any company. As it looks simple in textbooks to come up with solutions to problems faced
                                                         efforts  to  gather  reliable  and  useful  data  for  any real-life
     on  the  given  data,  it becomes  extremely  arduous
     problem. There were incomplete data, missing data, irrelevant data, erroneous data and in many cases even no

     history of data for certain portions of the project. In such situations, either you got to retrieve the data somehow

     or take mindful assumptions to maintain validity of your project as well.