Page 25 - type de document
P. 25

EOS          9XXXX-Template layout for gantry’s floor anchors







                                 IMPORTANT: Keep in mind that Template “B” will have dual purpose and will
                                 be used again in PART 2.




                   e.  Once the holes have been pre-drilled, remove the templates and

                      proceed to drill the holes all the way to the suggested 2.5 – 3.0 cm
                      depth.

                   f.  Notice that there are two separate diameters to drill and they both
                      use different types of anchors. (see image)

                   g.  The PDU requires 4X - 14mm diameter holes (M12 HDG anchors)


                   h.  The Laser column, the Cable tray and the Generator require 14X
                      8mm diameter holes (M6 HKD Drop-in anchors).

                   i.   Put template A away you will only need Template B on the next step
   20   21   22   23   24   25   26   27   28   29   30