Page 24 - type de document
P. 24
EOS 9XXXX-Template layout for gantry’s floor anchors
2. PART 1 – FRONTAL SIDE
a. Assemble both templates (A and B) on the floor using the frontal NIVELL as reference. (See
image)
b. Keep both templates securely fixed so they don’t slip. Identify the correct holes and choose
ONLY the holes marked with RED (See image).
c. Proceed to pre-drill the holes on both templates just to mark them on the floor. You will drill
them all the way later.
d. Notice that Template B will have 8 extra holes that will only be needed in PART 2. Ignore them
from now.