Page 16 - Panduan Simulasi Homer KKP PLTS Hybrid
P. 16
Cost Curve Breakdown
2. PV & BESS O&M Cost
No. Category Sub-Category No Category Sub-Category
System Sizing • PV Array Salaries • Local Operator &
• BESS Maintenance
• Diesel Genset • Local Operator
1 4
• Networks Network
• Coordinator
• Engineer
Investment • Capital Cost PV Trip • Vehicle Rent
• Capital Cost BESS • Housing Rent
2 • Diesel Genset 5 • Flight
• Powerhouse
• Networks
Overhead • Operator Other • Various (MCBs, cable,
• Coordinator other, network)
3 6
• Engineer • Internet cost